Brocade Communications Systems 8 Installationsanleitung Seite 110

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 186
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 109
FIGURE 36 Removal and replacement of the blower assembly
Replacing a blower assembly
Complete the following steps to replace the blower assembly in a chassis.
1. Orient the blower assembly and slide it into the chassis, pushing firmly to ensure that it is seated.
2. Verify that the power LED displays a green light.
3. Use the screwdriver or your fingers to tighten the captive screws.
WWN card removal and replacement
There are two WWN cards located beneath the WWN bezel (logo plate). As you are facing the bezel
on the non-port-side of the chassis, WWN 1 is located on the left side, and WWN 2 is on the right.
Before replacing cards, refererence RASlog messages and use the WWN Recovery Tool
(wwnrecover) as directed in the following sections to recover WWN cards. The tool will direct you to
Replacing a blower assembly
110 Brocade DCX 8510-8 Backbone Hardware Installation Guide
53-1002180-10
Seitenansicht 109
1 2 ... 105 106 107 108 109 110 111 112 113 114 115 ... 185 186

Kommentare zu diesen Handbüchern

Keine Kommentare