Brocade-communications-systems Brocade MLX Series and Brocade Netlron XMR 53-1002 Bedienungsanleitung Seite 279

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 452
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 278
Brocade MLX Series and Brocade NetIron XMR Hardware Installation Guide 261
53-1002373-02
Installing a Brocade NetIron XMR 8000 router
4
CAUTION
To ensure adequate bonding when attaching the ground lug, a minimum of 20 PSI of torque is
required to be applied to the mounting hardware used to attach the ground lug.
FIGURE 183 Crimping the power supply wire in the lug
5. Connect the -48V cable to the negative terminal and the 0V cable to the positive terminal as
marked on the power supply.
NOTE
DC return must be isolated from the device ground (DC-I) when connecting to the power supply.
6. Replace the transparent cover.
This equipment installation must meet NEC/CEC code requirements. Consult local authorities for
regulations.
Final steps
Follow these steps to complete the installation:
Attaching a management station”
Activating the power source”
“Verifying proper operation”
1
AWG power supply wire:
#8 AWG wire for 1200 W power supply
#6 AWG wire for 1800 W power supply
1
Seitenansicht 278
1 2 ... 274 275 276 277 278 279 280 281 282 283 284 ... 451 452

Kommentare zu diesen Handbüchern

Keine Kommentare