Site preparation
1
Brocade Mobility RFS7000-GR Controller Installation Guide 3
53-1001946-01
• Brocade strongly recommends the use of an Uninterruptible Power Supply
(UPS) that supports the IP-RFS7000 power rating. Not using a UPS can result in
data loss or equipment damage due to a power surge or power failure.
• Verify that the power connector and socket are accessible at all times during
the operation of the equipment.
• Do not work with power circuits in dimly lit spaces.
• Do not install this equipment or work with its power circuits during
thunderstorms or other weather conditions that could cause a power surge.
• Verify there is adequate ventilation around the device, and ambient
temperatures meet equipment operation specifications.
Site preparation
• Consult your site survey and network analysis reports to determine specific
equipment placement, port capacity, power drops, and so on.
• Assign installation responsibility to the appropriate personnel.
• Identify where all installed components are located.
• Verify appropriate rack mounting requirements.
• Provide a sufficient number of power drops for your equipment.
• Ensure adequate, dust-free ventilation to all installed equipment.
• Identify and prepare Ethernet and console port connections.
• Verify that cable lengths are within the maximum allowable distances for
optimal signal transmission.
• Verify that the Brocade Mobility RFS7000-GR Controller is powered through an
Uninterruptible Power Supply (UPS).